top of page

Site Utility Contractor in Virginia

JDP is a site utility contractor in Virginia providing labor and equipment for stormwater, sanitary, and related site utility work on Richmond and Central Virginia projects. We coordinate excavation, grading, E&S, access, and material responsibilities against the plans and written scope. The GC or owner furnishes permanent materials unless our proposal includes them. Send the project address, requested scope, schedule, and bid deadline for review.

Graded excavation with sloped earth banks beside a wooded area.

Your Site Utility Contractor in Virginia

Excavation and Grading Support

Labor and equipment for excavation, grading, and site preparation in accordance with the project plans and accepted scope.

Stormwater Sitework Support

Support for stormwater-related excavation, grading, and erosion and sediment control scopes when included in the written proposal.

Utility Sitework Support

Utility-related excavation and grading support. Material responsibility, work limits, and exact scope are confirmed from the bid documents and written agreement.

Define the Utility Scope Before Mobilization

Utility and stormwater work depends on the current plans, site access, existing utilities, ground conditions, and the sequence agreed with the project team. JDP provides labor, equipment, and supervision for the accepted excavation and sitework scope. The GC or owner supplies permanent materials unless the written proposal includes them.

Pipe, structures, bedding material, aggregate, testing, surveying, design, permitting, utility connections, and specialist work should be assigned explicitly before pricing. Send the project location, civil and utility drawings, specifications, quantities, anticipated schedule, and bid deadline. Note known conflicts, access restrictions, hauling needs, and the required handoff condition. We review the package and define the work, exclusions, material responsibilities, and coordination points in the proposal.

Excavation · Erosion Control · Request a Utility Proposal

bottom of page